Skip to main content

Option to have proportional hight for breaks

For example, for a gap of 1 hour, the string should be the same length as a 1-hour task. This way they are in the correct ratio.

Currently, all the gaps are a lot shorter than the tasks despite having a longer time duration, making it seem like I don't have enough spare time in comparison to the tasks.

If the ratio is 1:1, we can get a better visual understanding of how much spare time we have to utilise in comparison to the tasks.

I give my word, I'd sign up for the Pro for life version as soon as I find out this option is available on the app :)

3 comments

This request was merged into another request

Comments3

  • arelkai

    •

    Nov 21, 2023

    This would be a game-changer for me to have this option added. My ADHD time blindness makes it very hard to estimate how much time I have between tasks.

    If I could visually see a big break vs. a little break I would have a much better view of my day for planning purposes.

    It is also very hard for me to conceptualize when I have multiple tasks at the same time bc they look sequential until I read the time stamps.

  • Leo Mehlig

    Team•

    Mar 27, 2023

    The idea of Structured is to have a non-proportional timeline, but I could see this as an option in the future.